Crusher run calculator for Hawaii
Build a pavement-like base by ordering for the finished compacted depth, not an estimate of loose material.
Enter your project dimensions
Loose crusher run shrinks by 10-15% when compacted. If you buy only enough for the measured finished depth, the completed base may be half an inch too shallow. For that reason, this calculator starts with a +10% allowance selected. You may also hear it called crush and run or 2 inch minus on some tickets. It is crushed stone containing fines, weighing about 3,000 lb per cubic yard, and those fines help create a stable surface under tires.
Order for compacted depth
- Find the area in feet by multiplying length by width for a lane or pad.
- Choose the finished compacted depth for your layer. Use 4 inches for pavers and paths, 4-6 for driveways, and 6-8 in truck areas.
- To calculate, take cubic feet / 27 for yards and x 1.5 for tons. Leave the +10% selected. The listed depths apply after rolling, not while material is loose.
Tons and coverage
| Compacted depth | 1 cubic yard covers | 1 ton covers |
|---|---|---|
| 2 inches | 162 sq ft | ≈ 108 sq ft |
| 4 inches | 81 sq ft | ≈ 54 sq ft |
| 6 inches | 54 sq ft | ≈ 36 sq ft |
| 8 inches | 41 sq ft | ≈ 27 sq ft |
Suitable uses
- For a driveway, compact a 4-6 inches base layer. Add 2-3 inches of #57 or driveway gravel on top for the driving surface.
- For low-cost rural lanes, crusher run can be used by itself as a driving surface. It can get dusty in summer and may need grading again every 2-4 years.
- Pavers and slabs need a 4 inches base placed in 2-inch lifts and compacted. Calculate the entire paver buildup with the Paver Base Calculator.
- Use 4 inches for shed and hot-tub pads after stripping the ground. Increase it to 6 on soft soil.
- Do not use it in a French drain. The fines help crusher run bind, but they also retain water; use clean #57 or drain rock for drainage.
Example: a 20 x 10 parking pad
For 200 square feet finished at 4 inches after compaction, the calculation is 200 x 0.333 = 67 cubic feet = 2.5 cubic yards, or 3.7 tons. Order 4 tons to account for the allowance. Place one half, compact it, then add and compact the remaining material. Two 2-inch layers hold up for years longer than a single 4-inch placement. An afternoon rental of a plate compactor costs less than the first pothole repair, especially where rain can work into an uncompressed base.
Delivery guidance
- Have the base material and surface stone delivered together to keep the project moving. Delivery is free either way.
- Start at the far end of the run, then spread material back toward the pile. On large pads, working downhill instead of uphill saves a full day.
- Lightly mist each lift before you compact it. In Hawaii's rainy conditions, crusher run tightens more visibly when damp than dry.
- Set aside a wheelbarrow-load for touch-ups. You can use the same material to fill potholes if they develop.
How pricing works
Crusher run comes from crushing output instead of washed, sorted stone. On a 4-ton order, the +10% allowance can avoid needing a separate half-ton delivery. See the Crusher Run product page for the per-ton price, review Road Base too, and order the driveway's two layers in one free delivery.
Crusher run and crush and run FAQ
How much crusher run is needed for a driveway?
What does a yard of crusher run weigh?
How is crusher run different from gravel?
Are crush and run and crusher run identical?
Can crusher run remain as the surface?
How much will crusher run compress?
Other calculators
Base tonnage calculated.
Crusher run by the ton with free delivery.