Skip to main content
FREE Delivery!|Get a quote

Rip rap calculator for Hawaii

Calculate shoreline and slope tonnage using armor-layer depth, not shallow landscaping coverage.

Enter your project dimensions

ft
Enter a length greater than 0
ft
Enter a width greater than 0
ft
Enter a diameter greater than 0
in
Enter a depth between 0.25 and 24 inches
Add 5% extra for compaction & spillage

About 17 square feet is covered by one ton of riprap. The number is accurate. Because armor stone is placed 12 inches deep or more, a ton reaches only about one-tenth the area of landscape rock. A pile may appear modest beside the amount of bank it protects. This calculator uses installed depth, 3,100 lb per cubic yard, and rock generally ranging from 4 to 12 inches and larger.

How to measure an armored bank

  1. Use the sloped face for your measurement, rather than the level area above it. Measure down the bank with a tape, then multiply by the channel or shoreline length.
  2. For the rock layer, allow 1.5 to 2 times the diameter of the largest stone. A 12-inch depth is the minimum used for erosion control.
  3. Divide cubic feet by 27 for cubic yards, then multiply by 1.55 for tons.
Tons = (Slope-face area sq ft × Layer thickness in ÷ 12) ÷ 27 × 1.55

Tons and coverage

Layer thickness1 ton coversTons per 100 sq ft
12 inches≈ 17 sq ft5.7
18 inches≈ 12 sq ft8.6
24 inches≈ 9 sq ft11.5

Installation details for stable riprap

  • Start with fabric or bedding: place non-woven geotextile beneath the rock, or use 3-4 inches of #4 stone. On saturated windward clay, rock laid straight on soil may look settled for a season before runoff undermines the bank and the stone drops.
  • Lock in the toe by burying the lowest row below the waterline or anticipated scour depth. Riprap typically breaks down from the toe upward.
  • Rain runoff needs a stable face, so shape the slope to 2:1 or flatter before placing stone. A steeper face needs engineering, not additional rock.
  • For the exposed top layer, use a machine or hand placement to lock the stones together rather than leaving them where they roll.
  • For culvert outlets, carry the apron 4-6 pipe diameters past the outlet downstream. That is the area water scours.

Example calculation: 50 feet of pond bank

A shoreline slope 6-foot high and 50 feet long has 300 square feet of face. For an 18-inch layer: 300 x 1.5 = 450 cubic feet = 16.7 cubic yards, or about 26 tons of riprap and 27 with a small allowance. Include a geotextile roll, or use about 4 tons of #4 stone if rock bedding is preferred. Before ordering, walk the truck access route. The last 20 feet to a pond edge can bog down loaded trucks, and relocating stone twice costs twice.

After a major storm

After the water recedes, walk along the bank. Check the toe for displaced rock, exposed soil between stones, visible fabric, and any scouring at the outfall apron. Put shifted pieces back in place and use reserve stone to fill sparse areas. A brief check a couple of times each year, especially after heavy rain, is the ongoing upkeep.

Stone sizes at a glance

Select stone size for the force of the water. Four to eight inch riprap is suited to pond banks, gentle streams, and downspout outfalls. Use eight to twelve along lake edges exposed to boat wake and in faster channels. Highway and spillway projects have engineered classes and layer requirements, so follow their drawings instead of this page. When choosing between sizes, use the larger rock and a thicker layer. Greater stone weight allows more margin.

Riprap quantity, sizing and installation

How can I determine the rip rap quantity I need?
Multiply slope-face area by the layer thickness in feet, divide the result by 27, and multiply by 1.55. A 10 x 10 test patch at 12 inches equals 37 cubic feet, or about 2.1 tons.
What area will 1 ton of riprap cover?
Expect about 17 square feet from a 12-inch layer and 12 square feet from an 18-inch layer. For an initial budget, allow 5.5 to 6 tons for every 100 square feet at the standard depth.
What does a 1 ton pile of rip rap look like?
A ton forms a pile of roughly a cubic yard minus one-third, about as much volume as a washing machine. At the 6-8 inch size, that is 25-35 stones. Spread at the correct depth, it covers a 4 x 4 section of bank.
What is the cost of 1 ton of rip rap?
Riprap is priced above construction stone by size class. The current amount appears on our RipRap product page, and delivery is free. Fabric and bedding stone add a fraction more; they are the least costly system components to install correctly.
What depth should a rip rap layer have?
Use a layer measuring one and a half to two times the largest stone dimension, with a minimum of 12 inches. For typical 4-12 inch residential stone, use 12-18 inches; larger rock or fast water calls for 24.
Is hand placement an option for rip rap?
Hand placement works for stone up to about 6-8 inch if you have gloves and a strong back, but a ton means 25-35 lifts. Larger stone requires a machine. A skid steer can set in an hour what a crew places by hand in a day.

Protect exposed banks with armor stone.

Order RipRap by the ton with free delivery, along with #4 bedding stone for underneath it.

Shop RipRap

Select material from your results